International Experience with Private Sector Participation in Power Grids

Development of transmission and distribution (TD) infrastructure is crucial for the power systems. Regardless of the market models and the ownership structure, they have to be adequate for the continuity of the energy flow, the reliability of the power system and the quality of the energy supply. They have to be developed in parallel with the generation expansion in order to cope with the energy demand and to provide a sustainable service to the users and consumers. In this study, PSP practices of Turkey in TD have been investigated. In this respect; a general overview and historical background has been given in section two. The structural and regulatory aspects of PSP models in TD in the past and also after the reform have been explained in section three. It should be noted that, the PSP models used before the electricity market reform are also introduced in order to give information about different models. However, emphasis is given to the implementation of the recent PSP models. Results of implementation and problems are explained in sections four, five and six. Finally, conclusions, lessons learned and recommendations are discussed in section seven.

Saved in:
Bibliographic Details
Main Author: World Bank Group
Format: Report biblioteca
Language:English
en_US
Published: World Bank, Washington, DC 2012-05
Subjects:POWER GRID, RETAILING, TRANSMISSION CAPACITY, NATURAL GAS, POWER PLANTS, PRIVATE SECTOR PARTICIPATION, RETAIL COMPETITION, PRICE LEVELS, PRICE INCREASES, PLANT OWNER, ENERGY PRICES, DISTRIBUTION FACILITIES, GLOBAL KNOWLEDGE, SALES, POWER PLANT, POWER FLOWS, DEMAND GROWTH, VEHICLES, ACTIVITIES, GENERATION, SUPPLIER, ELECTRICITY SYSTEM, POWER SYSTEM, GRID CONNECTION, POWER GRIDS, IMAGE, COPYRIGHT, TRANSMISSION, ELECTRICITY DISTRIBUTION, DISTRIBUTION, FAIR, PRICING, ENERGY GENERATION, GAS, PRICE, PRICE CAP, VOLTAGE, ELECTRICITY GENERATION, DISTRIBUTION OF ELECTRICITY, TRANSMISSION SYSTEM, TRANSMISSION FACILITIES, ELECTRICITY CONSUMPTION, RETAIL, WASTEWATER TREATMENT, DATA, TECHNICAL ASSISTANCE, FEASIBILITY STUDIES, POWER SYSTEMS, POWER GENERATION, MARKET REFORM, ENERGY SOURCES, SUSTAINABLE ENERGY, POWER SECTOR, PRICING POLICY, THERMAL PLANTS, ENERGY SUPPLY, TRANSMISSION GRID, ELECTRIFICATION, OPTIONS, WATER, MONOPOLY, MARKET LIBERALIZATION, MARKETS, DISTRIBUTION LOSSES, ELECTRICITY SUPPLY, WHOLESALING, CONSULTANT, SALES AGREEMENT, POLLUTION, REHABILITATION INVESTMENTS, POWER PLANT SITE, DISTRIBUTION NETWORK, THERMAL POWER, POWER PLANT CONSTRUCTION, POWER PURCHASE AGREEMENTS, THERMAL POWER PLANT, PRICING MECHANISM, PRICE CONTROL, TRANSMISSION LINES, BALANCE, RESULTS, ELECTRICITY DEMAND, UTILITIES, PRIMARY ENERGY, VALUE, POWER, ELECTRICITY, DEMAND, PRICE REGULATION, HYDROPOWER, CONSUMER PRICE, EXPENDITURES, COST OF ENERGY, SALE, PRIVATE SECTOR, INSTITUTIONAL CAPACITY, MARKET, GRID ELECTRICITY, BIDDING, ELECTRICITY PRICES, ENERGY DEMAND, DISTRIBUTION GRID, TRANSMISSION LINE, INVESTMENT, COAL, TARIFF, ENERGY MANAGEMENT, SUPPLY, DEMAND FORECAST, AVAILABILITY, FACILITIES, ELECTRIC TRANSMISSION, INVESTMENTS, CONSUMER PRICE INDEX, SUPPLIERS, PRICE INDEX, ENERGY COSTS, PRICES, APPROACH, ELECTRICAL POWER, SUBSTATION EQUIPMENT, ENERGY, COMPETITION,
Online Access:http://documents.worldbank.org/curated/en/2015/12/25666042/international-experience-private-sector-participation-power-grids-turkey-case-study
https://hdl.handle.net/10986/23615
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Development of transmission and distribution (TD) infrastructure is crucial for the power systems. Regardless of the market models and the ownership structure, they have to be adequate for the continuity of the energy flow, the reliability of the power system and the quality of the energy supply. They have to be developed in parallel with the generation expansion in order to cope with the energy demand and to provide a sustainable service to the users and consumers. In this study, PSP practices of Turkey in TD have been investigated. In this respect; a general overview and historical background has been given in section two. The structural and regulatory aspects of PSP models in TD in the past and also after the reform have been explained in section three. It should be noted that, the PSP models used before the electricity market reform are also introduced in order to give information about different models. However, emphasis is given to the implementation of the recent PSP models. Results of implementation and problems are explained in sections four, five and six. Finally, conclusions, lessons learned and recommendations are discussed in section seven.