Planification hydraulique du Liban-Nord, Barrage de Dar Beachtar, vol 2, variante masque amont, retenue 40 mm3 (sureleveation), estimation du cout

Saved in:
Bibliographic Details
Main Authors: ATALLAH A, SOLTES J
Format: Texto biblioteca
Language:
Published: 1970
Subjects:STORAGE STRUCTURES, DAMS, ECONOMIC SITUATION, ENGINEERING, ESTIMATED COSTS, VOLUME, CONCRETE, EMBANKMENTS, STEEL, COSTS, WATER LEVELS, EXPROPRIATION, WATER UPTAKE, DESIGN, INSTALLATION DE STOCKAGE, BARRAGE, INSTALACIONES DE ALMACENAMIENTO, REPRESAS, SITUATION ECONOMIQUE, INGENIERIE, COUT ESTIME, BETON, DIGUE, ACIER, COUT, HAUTEUR DES EAUX, ABSORPTION D'EAU, CONCEPTION, SITUACION ECONOMICA, INGENIERIA, COSTO ESTIMADO, VOLUMEN, HORMIGON, DIQUES, ACERO, COSTOS, NIVEL DEL AGUA, EXPROPIACION, ABSORCION DE AGUA, DISENO,
Tags: Add Tag
No Tags, Be the first to tag this record!