Marshall parameters for quality control of hot mix asphalt after pavement construction

Abstract Highways have been and are built using Hot Mix Asphalt (HMA) as surface layer. The most common HMA design procedure is the Marshall Method, a method also used for quality control (QC) at the time of road construction. Due to several factors, sometimes it is not possible to sample the surface layer when constructed. When this occurs, QC is performed after construction by analyzing cores. Current regulations, however, fail having clear procedures regarding the collection and analysis of pavement cores after the complete placement of the asphalt mixture. For this reason, this study proposes a comparative analysis of Marshall parameters, mixture densities, and aggregates gradation obtained from specimens obtained during construction, versus cores samples extracted 30 and 60 days later. The research revealed that all the parameters measured on core samples, except flow, could be used to approve asphalt paving works after its construction.

Saved in:
Bibliographic Details
Main Authors: Bojorque Iñeguez,Jaime, Flores,Cristian, Vásquez,Mario
Format: Digital revista
Language:English
Published: Escuela de Construcción Civil, Pontificia Universidad Católica de Chile 2019
Online Access:http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2019000100178
Tags: Add Tag
No Tags, Be the first to tag this record!