Water temperature studies on the R. North Tyne after impoundment by Kielder dam. 1. General introduction and background data
This report describes the general background to the project, defines the stations from which data sets have been obtained and lists the available data. The project had the following aims: To develop a more accurate and less labour-intensive system for the collection and processing of water temperature data from a number of stations within a stream/river system, and to use the River North Tyne downstream of the Kielder impoundment as a test bed for the system. This should yield useful information on the effects of impoundment upon downstream water temperatures.
Main Author: | |
---|---|
Format: | monograph biblioteca |
Language: | English |
Published: |
Freshwater Biological Association
1984
|
Subjects: | Ecology, Limnology, Water temperature, Water temperature data, Calibration, Monitoring systems, Data loggers, England, Kielder Waters, |
Online Access: | http://hdl.handle.net/1834/22858 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|