Cyprus: Paphos feasibility study (covering phase A studies). Interim report
Saved in:
Main Author: | |
---|---|
Format: | Texto biblioteca |
Language: | |
Published: |
1969
|
Subjects: | CANALS, DAMS, ENGINEERING, ESTIMATED COSTS, WATER REQUIREMENTS, WATER SUPPLY, SEDIMENTATION, YIELDS, CANAL, BARRAGE, INGENIERIE, COUT ESTIME, BESOIN EN EAU, APPROVISIONNEMENT EN EAU, CANALES, REPRESAS, INGENIERIA, COSTO ESTIMADO, NECESIDADES DE AGUA, ABASTECIMIENTO DE AGUA, SEDIMENTACION, RENDEMENT, RENDIMIENTO, |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
unfao:721120 |
---|---|
record_format |
koha |
spelling |
unfao:7211202014-12-22T12:10:18ZCyprus: Paphos feasibility study (covering phase A studies). Interim report T. Ingledow & Associates Limited, Consulting Engineers, Vancouver (Canada) eng text1969 CANALSDAMSENGINEERINGESTIMATED COSTSWATER REQUIREMENTSWATER SUPPLYSEDIMENTATIONYIELDSCANALBARRAGEINGENIERIECOUT ESTIMEBESOIN EN EAUAPPROVISIONNEMENT EN EAUSEDIMENTATIONCANALESREPRESASINGENIERIACOSTO ESTIMADONECESIDADES DE AGUAABASTECIMIENTO DE AGUASEDIMENTACIONRENDEMENTRENDIMIENTO26392 |
institution |
FAO IT |
collection |
Koha |
country |
Italia |
countrycode |
IT |
component |
Bibliográfico |
access |
En linea |
databasecode |
cat-fao-it |
tag |
biblioteca |
region |
Europa del Sur |
libraryname |
David Lubin Memorial Library of FAO |
language |
|
topic |
CANALS DAMS ENGINEERING ESTIMATED COSTS WATER REQUIREMENTS WATER SUPPLY SEDIMENTATION YIELDS CANAL BARRAGE INGENIERIE COUT ESTIME BESOIN EN EAU APPROVISIONNEMENT EN EAU SEDIMENTATION CANALES REPRESAS INGENIERIA COSTO ESTIMADO NECESIDADES DE AGUA ABASTECIMIENTO DE AGUA SEDIMENTACION RENDEMENT RENDIMIENTO CANALS DAMS ENGINEERING ESTIMATED COSTS WATER REQUIREMENTS WATER SUPPLY SEDIMENTATION YIELDS CANAL BARRAGE INGENIERIE COUT ESTIME BESOIN EN EAU APPROVISIONNEMENT EN EAU SEDIMENTATION CANALES REPRESAS INGENIERIA COSTO ESTIMADO NECESIDADES DE AGUA ABASTECIMIENTO DE AGUA SEDIMENTACION RENDEMENT RENDIMIENTO |
spellingShingle |
CANALS DAMS ENGINEERING ESTIMATED COSTS WATER REQUIREMENTS WATER SUPPLY SEDIMENTATION YIELDS CANAL BARRAGE INGENIERIE COUT ESTIME BESOIN EN EAU APPROVISIONNEMENT EN EAU SEDIMENTATION CANALES REPRESAS INGENIERIA COSTO ESTIMADO NECESIDADES DE AGUA ABASTECIMIENTO DE AGUA SEDIMENTACION RENDEMENT RENDIMIENTO CANALS DAMS ENGINEERING ESTIMATED COSTS WATER REQUIREMENTS WATER SUPPLY SEDIMENTATION YIELDS CANAL BARRAGE INGENIERIE COUT ESTIME BESOIN EN EAU APPROVISIONNEMENT EN EAU SEDIMENTATION CANALES REPRESAS INGENIERIA COSTO ESTIMADO NECESIDADES DE AGUA ABASTECIMIENTO DE AGUA SEDIMENTACION RENDEMENT RENDIMIENTO T. Ingledow & Associates Limited, Consulting Engineers, Vancouver (Canada) eng Cyprus: Paphos feasibility study (covering phase A studies). Interim report |
format |
Texto |
topic_facet |
CANALS DAMS ENGINEERING ESTIMATED COSTS WATER REQUIREMENTS WATER SUPPLY SEDIMENTATION YIELDS CANAL BARRAGE INGENIERIE COUT ESTIME BESOIN EN EAU APPROVISIONNEMENT EN EAU SEDIMENTATION CANALES REPRESAS INGENIERIA COSTO ESTIMADO NECESIDADES DE AGUA ABASTECIMIENTO DE AGUA SEDIMENTACION RENDEMENT RENDIMIENTO |
author |
T. Ingledow & Associates Limited, Consulting Engineers, Vancouver (Canada) eng |
author_facet |
T. Ingledow & Associates Limited, Consulting Engineers, Vancouver (Canada) eng |
author_sort |
T. Ingledow & Associates Limited, Consulting Engineers, Vancouver (Canada) eng |
title |
Cyprus: Paphos feasibility study (covering phase A studies). Interim report |
title_short |
Cyprus: Paphos feasibility study (covering phase A studies). Interim report |
title_full |
Cyprus: Paphos feasibility study (covering phase A studies). Interim report |
title_fullStr |
Cyprus: Paphos feasibility study (covering phase A studies). Interim report |
title_full_unstemmed |
Cyprus: Paphos feasibility study (covering phase A studies). Interim report |
title_sort |
cyprus: paphos feasibility study (covering phase a studies). interim report |
publishDate |
1969 |
work_keys_str_mv |
AT tingledowassociateslimitedconsultingengineersvancouvercanadaeng cypruspaphosfeasibilitystudycoveringphaseastudiesinterimreport |
_version_ |
1768614390847766528 |