Evaluation of Project Duration Uncertainty using the Dependency Structure Matrix and Monte Carlo Simulations

The sequence of tasks is vital to the development of any project. The order of tasks is influenced by the information flow among them. The dependency structure matrix (DSM) can be used to model information flow. However, the information used by the DSM, including task duration, time required for communication, and task overlap, can have uncertain values. The aim of this paper is to analyze the effect of uncertainty on the scheduling of tasks using the DSM. Monte Carlo Simulation is applied to represent uncertainty in time estimates for projects using DSM. Conventional project duration, normal project duration with communication times, and normal project duration containing natural overlapping were considered for project time estimations. Several distribution functions were used to represent the uncertainty. It is concluded that project duration has normal distribution behavior that is independent of the type of input parameter distribution functions; that mean values of the input parameters give a good estimation of mean project duration; that interval and inner interval arithmetic give overestimation and underestimation of project duration times respectively.

Saved in:
Bibliographic Details
Main Authors: Gálvez,Edelmira Delfina, Ordieres,Joaquin Bienvenido, Capuz-Rizo,Salvador Fernando
Format: Digital revista
Language:English
Published: Escuela de Construcción Civil, Pontificia Universidad Católica de Chile 2015
Online Access:http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2015000200010
Tags: Add Tag
No Tags, Be the first to tag this record!
id oai:scielo:S0718-915X2015000200010
record_format ojs
spelling oai:scielo:S0718-915X20150002000102015-09-03Evaluation of Project Duration Uncertainty using the Dependency Structure Matrix and Monte Carlo SimulationsGálvez,Edelmira DelfinaOrdieres,Joaquin BienvenidoCapuz-Rizo,Salvador Fernando DSM Project Duration Managing Project Monte Carlo Simulation Interval Arithmetic The sequence of tasks is vital to the development of any project. The order of tasks is influenced by the information flow among them. The dependency structure matrix (DSM) can be used to model information flow. However, the information used by the DSM, including task duration, time required for communication, and task overlap, can have uncertain values. The aim of this paper is to analyze the effect of uncertainty on the scheduling of tasks using the DSM. Monte Carlo Simulation is applied to represent uncertainty in time estimates for projects using DSM. Conventional project duration, normal project duration with communication times, and normal project duration containing natural overlapping were considered for project time estimations. Several distribution functions were used to represent the uncertainty. It is concluded that project duration has normal distribution behavior that is independent of the type of input parameter distribution functions; that mean values of the input parameters give a good estimation of mean project duration; that interval and inner interval arithmetic give overestimation and underestimation of project duration times respectively.info:eu-repo/semantics/openAccessEscuela de Construcción Civil, Pontificia Universidad Católica de ChileRevista de la construcción v.14 n.2 20152015-08-01text/htmlhttp://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2015000200010en10.4067/S0718-915X2015000200010
institution SCIELO
collection OJS
country Chile
countrycode CL
component Revista
access En linea
databasecode rev-scielo-cl
tag revista
region America del Sur
libraryname SciELO
language English
format Digital
author Gálvez,Edelmira Delfina
Ordieres,Joaquin Bienvenido
Capuz-Rizo,Salvador Fernando
spellingShingle Gálvez,Edelmira Delfina
Ordieres,Joaquin Bienvenido
Capuz-Rizo,Salvador Fernando
Evaluation of Project Duration Uncertainty using the Dependency Structure Matrix and Monte Carlo Simulations
author_facet Gálvez,Edelmira Delfina
Ordieres,Joaquin Bienvenido
Capuz-Rizo,Salvador Fernando
author_sort Gálvez,Edelmira Delfina
title Evaluation of Project Duration Uncertainty using the Dependency Structure Matrix and Monte Carlo Simulations
title_short Evaluation of Project Duration Uncertainty using the Dependency Structure Matrix and Monte Carlo Simulations
title_full Evaluation of Project Duration Uncertainty using the Dependency Structure Matrix and Monte Carlo Simulations
title_fullStr Evaluation of Project Duration Uncertainty using the Dependency Structure Matrix and Monte Carlo Simulations
title_full_unstemmed Evaluation of Project Duration Uncertainty using the Dependency Structure Matrix and Monte Carlo Simulations
title_sort evaluation of project duration uncertainty using the dependency structure matrix and monte carlo simulations
description The sequence of tasks is vital to the development of any project. The order of tasks is influenced by the information flow among them. The dependency structure matrix (DSM) can be used to model information flow. However, the information used by the DSM, including task duration, time required for communication, and task overlap, can have uncertain values. The aim of this paper is to analyze the effect of uncertainty on the scheduling of tasks using the DSM. Monte Carlo Simulation is applied to represent uncertainty in time estimates for projects using DSM. Conventional project duration, normal project duration with communication times, and normal project duration containing natural overlapping were considered for project time estimations. Several distribution functions were used to represent the uncertainty. It is concluded that project duration has normal distribution behavior that is independent of the type of input parameter distribution functions; that mean values of the input parameters give a good estimation of mean project duration; that interval and inner interval arithmetic give overestimation and underestimation of project duration times respectively.
publisher Escuela de Construcción Civil, Pontificia Universidad Católica de Chile
publishDate 2015
url http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2015000200010
work_keys_str_mv AT galvezedelmiradelfina evaluationofprojectdurationuncertaintyusingthedependencystructurematrixandmontecarlosimulations
AT ordieresjoaquinbienvenido evaluationofprojectdurationuncertaintyusingthedependencystructurematrixandmontecarlosimulations
AT capuzrizosalvadorfernando evaluationofprojectdurationuncertaintyusingthedependencystructurematrixandmontecarlosimulations
_version_ 1755998224311648256