Studies for Grid Connection of VRE Generation Plants
This technical guide is the third in a series of four technical guides on variable renewable energy (VRE) grid integration produced by the Energy Sector Management Assistance Program (ESMAP) of the World Bank and the Global Sustainable Electricity Partnership (GSEP). It provides guidance on how to approach power system studies, which are required to ensure the stable interconnection of utility-scale VRE plants into the grid. The report, which focuses on the transmission grid, identifies the steps the grid operator and the VRE resource entity need to follow to integrate these resources safely and effectively. It shows how power system studies verify that adequate reserves and system resources exist or what additional measures are required to reliably serve demand under credible contingencies, such as the loss of a generating unit, a transformer, or a transmission facility. The requirements for integration are elaborated in Technical Guide 1 (Grid Integration Requirements for Variable Renewable Energy).
Main Author: | |
---|---|
Format: | Technical Paper biblioteca |
Language: | English |
Published: |
World Bank, Washington, DC
2019-07
|
Subjects: | POWER GRID, RENEWABLE ENERGY, ENERGY GENERATION, ENERGY TRANSMISSION, |
Online Access: | http://documents.worldbank.org/curated/en/742561562862363700/Studies-for-Grid-Connection-of-VRE-Generation-Plants https://hdl.handle.net/10986/32073 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
dig-okr-1098632073 |
---|---|
record_format |
koha |
spelling |
dig-okr-10986320732024-10-17T09:10:43Z Studies for Grid Connection of VRE Generation Plants Energy Sector Management Assistance Program POWER GRID RENEWABLE ENERGY ENERGY GENERATION ENERGY TRANSMISSION This technical guide is the third in a series of four technical guides on variable renewable energy (VRE) grid integration produced by the Energy Sector Management Assistance Program (ESMAP) of the World Bank and the Global Sustainable Electricity Partnership (GSEP). It provides guidance on how to approach power system studies, which are required to ensure the stable interconnection of utility-scale VRE plants into the grid. The report, which focuses on the transmission grid, identifies the steps the grid operator and the VRE resource entity need to follow to integrate these resources safely and effectively. It shows how power system studies verify that adequate reserves and system resources exist or what additional measures are required to reliably serve demand under credible contingencies, such as the loss of a generating unit, a transformer, or a transmission facility. The requirements for integration are elaborated in Technical Guide 1 (Grid Integration Requirements for Variable Renewable Energy). 2019-07-12T18:06:57Z 2019-07-12T18:06:57Z 2019-07 Technical Paper Document technique Documento técnico http://documents.worldbank.org/curated/en/742561562862363700/Studies-for-Grid-Connection-of-VRE-Generation-Plants https://hdl.handle.net/10986/32073 English ESMAP Technical Guide; CC BY 3.0 IGO http://creativecommons.org/licenses/by/3.0/igo World Bank application/pdf text/plain World Bank, Washington, DC |
institution |
Banco Mundial |
collection |
DSpace |
country |
Estados Unidos |
countrycode |
US |
component |
Bibliográfico |
access |
En linea |
databasecode |
dig-okr |
tag |
biblioteca |
region |
America del Norte |
libraryname |
Biblioteca del Banco Mundial |
language |
English |
topic |
POWER GRID RENEWABLE ENERGY ENERGY GENERATION ENERGY TRANSMISSION POWER GRID RENEWABLE ENERGY ENERGY GENERATION ENERGY TRANSMISSION |
spellingShingle |
POWER GRID RENEWABLE ENERGY ENERGY GENERATION ENERGY TRANSMISSION POWER GRID RENEWABLE ENERGY ENERGY GENERATION ENERGY TRANSMISSION Energy Sector Management Assistance Program Studies for Grid Connection of VRE Generation Plants |
description |
This technical guide is the third in a
series of four technical guides on variable renewable energy
(VRE) grid integration produced by the Energy Sector
Management Assistance Program (ESMAP) of the World Bank and
the Global Sustainable Electricity Partnership (GSEP). It
provides guidance on how to approach power system studies,
which are required to ensure the stable interconnection of
utility-scale VRE plants into the grid. The report, which
focuses on the transmission grid, identifies the steps the
grid operator and the VRE resource entity need to follow to
integrate these resources safely and effectively. It shows
how power system studies verify that adequate reserves and
system resources exist or what additional measures are
required to reliably serve demand under credible
contingencies, such as the loss of a generating unit, a
transformer, or a transmission facility. The requirements
for integration are elaborated in Technical Guide 1 (Grid
Integration Requirements for Variable Renewable Energy). |
format |
Technical Paper |
topic_facet |
POWER GRID RENEWABLE ENERGY ENERGY GENERATION ENERGY TRANSMISSION |
author |
Energy Sector Management Assistance Program |
author_facet |
Energy Sector Management Assistance Program |
author_sort |
Energy Sector Management Assistance Program |
title |
Studies for Grid Connection of VRE Generation Plants |
title_short |
Studies for Grid Connection of VRE Generation Plants |
title_full |
Studies for Grid Connection of VRE Generation Plants |
title_fullStr |
Studies for Grid Connection of VRE Generation Plants |
title_full_unstemmed |
Studies for Grid Connection of VRE Generation Plants |
title_sort |
studies for grid connection of vre generation plants |
publisher |
World Bank, Washington, DC |
publishDate |
2019-07 |
url |
http://documents.worldbank.org/curated/en/742561562862363700/Studies-for-Grid-Connection-of-VRE-Generation-Plants https://hdl.handle.net/10986/32073 |