Philippines - Typhoons Ondoy and Pepeng : Post-Disaster Needs Assessment - Sector Reports

Tropical storm Ondoy (international name Ketsana) hit the Philippines on September 26, 2009, causing widespread flooding Tropical storm Ondoy was quickly followed by typhoon Pepeng (international name Parma). It initially brought powerful winds with gusts of up to 230 km/hr then an extended period of heavy rains, with cumulative rainfall amounts exceeding 1,000 mm in some areas. The resulting river floods have been estimated to have a return period of around 50 years, meaning that statistically speaking, such a rainfall event occurs on average once in every 50 years. Ondoy and Pepeng resulted in large numbers of affected persons and casualties. The Government declared a National Sate of Calamity on October 2nd. The Department of Finance requested development partners to undertake a Post-Disaster Needs Assessment (PDNA) jointly with the Government. In response, development partners organized a team of local and international experts to initiate the Post-Disaster Needs Assessment (PDNA) process for Ondoy and Pepeng with Government agencies. The needs for financing are large, but the cost of doing nothing would be larger still. This PDNA estimates the total cost of recovery and reconstruction at US$ 4.42 billion.

Saved in:
Bibliographic Details
Main Author: World Bank
Language:English
Published: World Bank 2011-01-01
Subjects:ADMINISTRATIVE REGION, AGRICULTURE, AQUACULTURE, BIKES, CAPITAL REGION, CAR, CLIMATE CHANGE, COMMERCIAL CROPS, DAMAGES, DISASTER, DISASTER RECOVERY, DISASTER RISK, DISASTER RISK REDUCTION, DISASTERS, DRAINAGE, EMERGENCY RESTORATION, EQUIPMENT, FARMERS, FISH, FISHERIES, FLOOD, FLOOD CONTROL, FLOOD MANAGEMENT, FORESTRY SECTOR, FUEL, HOUSING, INCOMES, IRRIGATION, LIGHT RAIL, LIGHT RAIL TRANSIT, LIVELIHOODS, LIVESTOCK, METRO RAIL, O&M, PHYSICAL DAMAGE, PRIVATE SECTOR, RAIL TRANSIT SYSTEM, RAIL TRANSPORT, RECONSTRUCTION, REGIONAL DISTRIBUTION, RELIEF, RICE REGION, ROADS, RURAL HEALTH, RURAL PRODUCTION, TAXI DRIVER, TRANSPORT SYSTEM, TRANSPORTATION, TYPHOON, TYPHOONS, VEGETABLES, VEHICLE, VEHICLE OPERATING, VEHICLE OPERATING COSTS, VULNERABLE GROUPS, WARNING SYSTEM, WOOD,
Online Access:http://www-wds.worldbank.org/external/default/main?menuPK=64187510&pagePK=64193027&piPK=64187937&theSitePK=523679&menuPK=64187510&searchMenuPK=64187283&siteName=WDS&entityID=000333038_20110923013808
https://hdl.handle.net/10986/2778
Tags: Add Tag
No Tags, Be the first to tag this record!
id dig-okr-109862778
record_format koha
spelling dig-okr-1098627782024-08-08T15:33:27Z Philippines - Typhoons Ondoy and Pepeng : Post-Disaster Needs Assessment - Sector Reports World Bank ADMINISTRATIVE REGION AGRICULTURE AQUACULTURE BIKES CAPITAL REGION CAR CLIMATE CHANGE COMMERCIAL CROPS DAMAGES DISASTER DISASTER RECOVERY DISASTER RISK DISASTER RISK REDUCTION DISASTERS DRAINAGE EMERGENCY RESTORATION EQUIPMENT FARMERS FISH FISHERIES FLOOD FLOOD CONTROL FLOOD MANAGEMENT FORESTRY SECTOR FUEL HOUSING INCOMES IRRIGATION LIGHT RAIL LIGHT RAIL TRANSIT LIVELIHOODS LIVESTOCK METRO RAIL O&M PHYSICAL DAMAGE PRIVATE SECTOR RAIL TRANSIT SYSTEM RAIL TRANSPORT RECONSTRUCTION REGIONAL DISTRIBUTION RELIEF RICE REGION ROADS RURAL HEALTH RURAL PRODUCTION TAXI DRIVER TRANSPORT SYSTEM TRANSPORTATION TYPHOON TYPHOONS VEGETABLES VEHICLE VEHICLE OPERATING VEHICLE OPERATING COSTS VULNERABLE GROUPS WARNING SYSTEM WOOD Tropical storm Ondoy (international name Ketsana) hit the Philippines on September 26, 2009, causing widespread flooding Tropical storm Ondoy was quickly followed by typhoon Pepeng (international name Parma). It initially brought powerful winds with gusts of up to 230 km/hr then an extended period of heavy rains, with cumulative rainfall amounts exceeding 1,000 mm in some areas. The resulting river floods have been estimated to have a return period of around 50 years, meaning that statistically speaking, such a rainfall event occurs on average once in every 50 years. Ondoy and Pepeng resulted in large numbers of affected persons and casualties. The Government declared a National Sate of Calamity on October 2nd. The Department of Finance requested development partners to undertake a Post-Disaster Needs Assessment (PDNA) jointly with the Government. In response, development partners organized a team of local and international experts to initiate the Post-Disaster Needs Assessment (PDNA) process for Ondoy and Pepeng with Government agencies. The needs for financing are large, but the cost of doing nothing would be larger still. This PDNA estimates the total cost of recovery and reconstruction at US$ 4.42 billion. 2012-03-19T10:13:18Z 2012-03-19T10:13:18Z 2011-01-01 http://www-wds.worldbank.org/external/default/main?menuPK=64187510&pagePK=64193027&piPK=64187937&theSitePK=523679&menuPK=64187510&searchMenuPK=64187283&siteName=WDS&entityID=000333038_20110923013808 https://hdl.handle.net/10986/2778 English CC BY 3.0 IGO http://creativecommons.org/licenses/by/3.0/igo/ World Bank application/pdf text/plain World Bank
institution Banco Mundial
collection DSpace
country Estados Unidos
countrycode US
component Bibliográfico
access En linea
databasecode dig-okr
tag biblioteca
region America del Norte
libraryname Biblioteca del Banco Mundial
language English
topic ADMINISTRATIVE REGION
AGRICULTURE
AQUACULTURE
BIKES
CAPITAL REGION
CAR
CLIMATE CHANGE
COMMERCIAL CROPS
DAMAGES
DISASTER
DISASTER RECOVERY
DISASTER RISK
DISASTER RISK REDUCTION
DISASTERS
DRAINAGE
EMERGENCY RESTORATION
EQUIPMENT
FARMERS
FISH
FISHERIES
FLOOD
FLOOD CONTROL
FLOOD MANAGEMENT
FORESTRY SECTOR
FUEL
HOUSING
INCOMES
IRRIGATION
LIGHT RAIL
LIGHT RAIL TRANSIT
LIVELIHOODS
LIVESTOCK
METRO RAIL
O&M
PHYSICAL DAMAGE
PRIVATE SECTOR
RAIL TRANSIT SYSTEM
RAIL TRANSPORT
RECONSTRUCTION
REGIONAL DISTRIBUTION
RELIEF
RICE REGION
ROADS
RURAL HEALTH
RURAL PRODUCTION
TAXI DRIVER
TRANSPORT SYSTEM
TRANSPORTATION
TYPHOON
TYPHOONS
VEGETABLES
VEHICLE
VEHICLE OPERATING
VEHICLE OPERATING COSTS
VULNERABLE GROUPS
WARNING SYSTEM
WOOD
ADMINISTRATIVE REGION
AGRICULTURE
AQUACULTURE
BIKES
CAPITAL REGION
CAR
CLIMATE CHANGE
COMMERCIAL CROPS
DAMAGES
DISASTER
DISASTER RECOVERY
DISASTER RISK
DISASTER RISK REDUCTION
DISASTERS
DRAINAGE
EMERGENCY RESTORATION
EQUIPMENT
FARMERS
FISH
FISHERIES
FLOOD
FLOOD CONTROL
FLOOD MANAGEMENT
FORESTRY SECTOR
FUEL
HOUSING
INCOMES
IRRIGATION
LIGHT RAIL
LIGHT RAIL TRANSIT
LIVELIHOODS
LIVESTOCK
METRO RAIL
O&M
PHYSICAL DAMAGE
PRIVATE SECTOR
RAIL TRANSIT SYSTEM
RAIL TRANSPORT
RECONSTRUCTION
REGIONAL DISTRIBUTION
RELIEF
RICE REGION
ROADS
RURAL HEALTH
RURAL PRODUCTION
TAXI DRIVER
TRANSPORT SYSTEM
TRANSPORTATION
TYPHOON
TYPHOONS
VEGETABLES
VEHICLE
VEHICLE OPERATING
VEHICLE OPERATING COSTS
VULNERABLE GROUPS
WARNING SYSTEM
WOOD
spellingShingle ADMINISTRATIVE REGION
AGRICULTURE
AQUACULTURE
BIKES
CAPITAL REGION
CAR
CLIMATE CHANGE
COMMERCIAL CROPS
DAMAGES
DISASTER
DISASTER RECOVERY
DISASTER RISK
DISASTER RISK REDUCTION
DISASTERS
DRAINAGE
EMERGENCY RESTORATION
EQUIPMENT
FARMERS
FISH
FISHERIES
FLOOD
FLOOD CONTROL
FLOOD MANAGEMENT
FORESTRY SECTOR
FUEL
HOUSING
INCOMES
IRRIGATION
LIGHT RAIL
LIGHT RAIL TRANSIT
LIVELIHOODS
LIVESTOCK
METRO RAIL
O&M
PHYSICAL DAMAGE
PRIVATE SECTOR
RAIL TRANSIT SYSTEM
RAIL TRANSPORT
RECONSTRUCTION
REGIONAL DISTRIBUTION
RELIEF
RICE REGION
ROADS
RURAL HEALTH
RURAL PRODUCTION
TAXI DRIVER
TRANSPORT SYSTEM
TRANSPORTATION
TYPHOON
TYPHOONS
VEGETABLES
VEHICLE
VEHICLE OPERATING
VEHICLE OPERATING COSTS
VULNERABLE GROUPS
WARNING SYSTEM
WOOD
ADMINISTRATIVE REGION
AGRICULTURE
AQUACULTURE
BIKES
CAPITAL REGION
CAR
CLIMATE CHANGE
COMMERCIAL CROPS
DAMAGES
DISASTER
DISASTER RECOVERY
DISASTER RISK
DISASTER RISK REDUCTION
DISASTERS
DRAINAGE
EMERGENCY RESTORATION
EQUIPMENT
FARMERS
FISH
FISHERIES
FLOOD
FLOOD CONTROL
FLOOD MANAGEMENT
FORESTRY SECTOR
FUEL
HOUSING
INCOMES
IRRIGATION
LIGHT RAIL
LIGHT RAIL TRANSIT
LIVELIHOODS
LIVESTOCK
METRO RAIL
O&M
PHYSICAL DAMAGE
PRIVATE SECTOR
RAIL TRANSIT SYSTEM
RAIL TRANSPORT
RECONSTRUCTION
REGIONAL DISTRIBUTION
RELIEF
RICE REGION
ROADS
RURAL HEALTH
RURAL PRODUCTION
TAXI DRIVER
TRANSPORT SYSTEM
TRANSPORTATION
TYPHOON
TYPHOONS
VEGETABLES
VEHICLE
VEHICLE OPERATING
VEHICLE OPERATING COSTS
VULNERABLE GROUPS
WARNING SYSTEM
WOOD
World Bank
Philippines - Typhoons Ondoy and Pepeng : Post-Disaster Needs Assessment - Sector Reports
description Tropical storm Ondoy (international name Ketsana) hit the Philippines on September 26, 2009, causing widespread flooding Tropical storm Ondoy was quickly followed by typhoon Pepeng (international name Parma). It initially brought powerful winds with gusts of up to 230 km/hr then an extended period of heavy rains, with cumulative rainfall amounts exceeding 1,000 mm in some areas. The resulting river floods have been estimated to have a return period of around 50 years, meaning that statistically speaking, such a rainfall event occurs on average once in every 50 years. Ondoy and Pepeng resulted in large numbers of affected persons and casualties. The Government declared a National Sate of Calamity on October 2nd. The Department of Finance requested development partners to undertake a Post-Disaster Needs Assessment (PDNA) jointly with the Government. In response, development partners organized a team of local and international experts to initiate the Post-Disaster Needs Assessment (PDNA) process for Ondoy and Pepeng with Government agencies. The needs for financing are large, but the cost of doing nothing would be larger still. This PDNA estimates the total cost of recovery and reconstruction at US$ 4.42 billion.
topic_facet ADMINISTRATIVE REGION
AGRICULTURE
AQUACULTURE
BIKES
CAPITAL REGION
CAR
CLIMATE CHANGE
COMMERCIAL CROPS
DAMAGES
DISASTER
DISASTER RECOVERY
DISASTER RISK
DISASTER RISK REDUCTION
DISASTERS
DRAINAGE
EMERGENCY RESTORATION
EQUIPMENT
FARMERS
FISH
FISHERIES
FLOOD
FLOOD CONTROL
FLOOD MANAGEMENT
FORESTRY SECTOR
FUEL
HOUSING
INCOMES
IRRIGATION
LIGHT RAIL
LIGHT RAIL TRANSIT
LIVELIHOODS
LIVESTOCK
METRO RAIL
O&M
PHYSICAL DAMAGE
PRIVATE SECTOR
RAIL TRANSIT SYSTEM
RAIL TRANSPORT
RECONSTRUCTION
REGIONAL DISTRIBUTION
RELIEF
RICE REGION
ROADS
RURAL HEALTH
RURAL PRODUCTION
TAXI DRIVER
TRANSPORT SYSTEM
TRANSPORTATION
TYPHOON
TYPHOONS
VEGETABLES
VEHICLE
VEHICLE OPERATING
VEHICLE OPERATING COSTS
VULNERABLE GROUPS
WARNING SYSTEM
WOOD
author World Bank
author_facet World Bank
author_sort World Bank
title Philippines - Typhoons Ondoy and Pepeng : Post-Disaster Needs Assessment - Sector Reports
title_short Philippines - Typhoons Ondoy and Pepeng : Post-Disaster Needs Assessment - Sector Reports
title_full Philippines - Typhoons Ondoy and Pepeng : Post-Disaster Needs Assessment - Sector Reports
title_fullStr Philippines - Typhoons Ondoy and Pepeng : Post-Disaster Needs Assessment - Sector Reports
title_full_unstemmed Philippines - Typhoons Ondoy and Pepeng : Post-Disaster Needs Assessment - Sector Reports
title_sort philippines - typhoons ondoy and pepeng : post-disaster needs assessment - sector reports
publisher World Bank
publishDate 2011-01-01
url http://www-wds.worldbank.org/external/default/main?menuPK=64187510&pagePK=64193027&piPK=64187937&theSitePK=523679&menuPK=64187510&searchMenuPK=64187283&siteName=WDS&entityID=000333038_20110923013808
https://hdl.handle.net/10986/2778
work_keys_str_mv AT worldbank philippinestyphoonsondoyandpepengpostdisasterneedsassessmentsectorreports
_version_ 1807154174781030400